martin 10-04-2015 12:17 PM

[QUOTE=martin;239272]Rule 13,523....do not throw away parts to be replaced...took mese time to just make a pattern for front anchor locker...BTW this is the rule right after the one. About make sure you have all bulkheads in before glueing down Cap!!! Smdh[/QUOTE
Pic
]

martin 10-04-2015 12:19 PM

1 Attachment(s)
[QUOTE=martin;239273]
Quote:

Originally Posted by martin (Post 239272)
Rule 13,523....do not throw away parts to be replaced...took mese time to just make a pattern for front anchor locker...BTW this is the rule right after the one. About make sure you have all bulkheads in before glueing down Cap!!! Smdh[/QUOTE
Pic
]


martin 10-08-2015 10:39 PM

Layed up one side of the forward anchor bulkhead hatch.used the outside patio table as my layup table.. Layed some visqune down. Cut the 1708 and wet out, then wet one side of the foam. Set it and forget it. Well not until I layed another layer on top of foam and added weight to pull the excess resin to the top.....

martin 10-08-2015 10:42 PM

Anchor bulkhead
 
5 Attachment(s)
Layup

martin 10-08-2015 10:44 PM

Paint
 
I hope to have her painted by December...

martin 02-10-2016 06:21 AM

I cannot wait for the Temps to warm abit.. although sanding in 40 degree weather is like sanding in an air conditioned tyvex.... I am getting the itch again..

martin 04-06-2016 08:56 PM

Well it is finally getting the tic it needs.. I sent my boat to the most eperienced fiberglass boat builder in Panama City..Mattke Brothers I know will do a fine job...

martin 04-12-2016 09:07 PM

Forward progress
 
Well it has been five days now and Steve Matkke has been making some forward progress. I made a list of things I wanted done, most of it being custom work...so far I am very please with the results and most of all the communications we keep with each other during the build process..mind you I hired him do just fiberglass work and some fairing. As I will do the final fair,prime and paint...

martin 04-12-2016 09:12 PM

Pics
 
4 Attachment(s)
Quote:

Originally Posted by martin (Post 242971)
Well it has been five days now and Steve Matkke has been making some forward progress. I made a list of things I wanted done, most of it being custom work...so far I am very please with the results and most of all the communications we keep with each other during the build process..mind you I hired him do just fiberglass work and some fairing. As I will do the final fair,prime and paint...

pics

martin 04-12-2016 09:13 PM

Rubrail and vents
 
Pics