![]() |
Very nice work!
|
2 Attachment(s)
The rubrail went on today
|
how hard was it to do the metal rub rail, i have never done a metal one and i am gonna be due soon.
|
It goes on in two stages-first the hard plastic rub rail gets positioned and screwed to the boat. then the stainless piece gets positioned and screwed on top of that. The two things that you have to be careful with: making sure that the screw holes in the stainless pieces are not near the bends in the corners, and planning ahead so that if the screw holes in the stainless overlap a screw in the plastic that you can remove it and go with one screw thru both pieces.
|
The Project continues
1 Attachment(s)
Washdown system is installed
|
3 Attachment(s)
The spreader, T top and underwater lights are fired up
|
Very nice!
strick |
Yes. Sweet. Where did you get the underwater LEDs?
Dave |
Quote:
his number is 910 209 2920 |
Thanks for the info.
|
All times are GMT -4. The time now is 09:45 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
All original content © 2003-2013 ClassicSeacraft