OK, the drive's been resealed, U-Joints replaced and has been installed, the tilt/trim motor is now on an aluminum bracket and operating. Not much was left of the old steel bracket, hell the solenoids were just hanging by the wires! Both T/T cylinders have been rebuilt and the carb also. This weekend I'll re-tune the engine and see how everything works. $600 in the hole already! Hopefully everything will be OK to be ready for June!