View Single Post
  #39  
Old 10-20-2006, 12:15 PM
Bobv Bobv is offline
Member
 
Join Date: Mar 2006
Location: Savannah, Georgia
Posts: 56
Default Re: A New Boat to Check Out

The bracket is finally in place. One of the many things to wrap up before the floor goes back in.




Baitwell plumbing finished.



Bilge pump "cartridges" were fabricated so that the pumps can be changed out very easily. They are attached to the back side of the inner transom wall.





Battery boxes are finished. Macerator pump for forward fish box in place on top of fresh water holding tank. Fresh water fill and vent hoses are attached.








The cap is finished up and ready to go back on.



The cap is completely glassed in place. Much more stiff.
Reply With Quote