Thread
:
Bracket Project
View Single Post
#
47
03-07-2007, 03:02 AM
Bigshrimpin
Senior Member
Join Date: Dec 2002
Location: Onset, MA
Posts: 2,712
Re: Bracket Project
Ran out of epoxy after the stringers . . . so I got to bend over at west marine and pay $141 for one gallon of epoxy resin and hardener (that's what 5 gallons of Vinylester cost). Anyway . . . after I got over it . . . I was lucky enough to get the bracket glued together and taped (3 layers of 4" 1708 tape bonding the platform to the tub from the inside). I even painted the inside before it was glassed together. Came out pretty good considering I couldn't see what I was doing inside the bracket.
Bigshrimpin
View Public Profile
Send a private message to Bigshrimpin
Find all posts by Bigshrimpin