Thread: Bracket Project
View Single Post
  #50  
Old 03-08-2007, 07:24 PM
Bigshrimpin Bigshrimpin is offline
Senior Member
 
Join Date: Dec 2002
Location: Onset, MA
Posts: 2,712
Default Re: Bracket Project

The molded pieces (top platform and tub) were done in vinylester. The stringers were done with epoxy and I bonded the top platform and the bottom tub together using epoxy. Epoxy supposedly has stronger secondary bonding properties. I used a little over 10 gallons of vinylester and 1 gallon of epoxy in the project.

I got some very good pricing on ISO polyester in the 5 gallon pails, so I don't think we'll need to do a drum unless chuck wants to build a boat from scratch.
Reply With Quote