View Single Post
  #258  
Old 04-21-2007, 10:22 PM
strick strick is offline
Senior Member
 
Join Date: Aug 2003
Location: California
Posts: 2,738
Default Re: Here We Go Again

More bracket work. Better hurry Tim I'm catching up

The transom is made up of 2 pieces of 3/4 inch ply with a 5/8 inch foam in the center. This was cut to fit and cabosiled in place.



3 layers of 1708 over the top




The stringers are made of 2 pieces of 5/8 foam glued together. They are tabbed to the flotation chamber and glassed in place.




More foam is glassed in place to build a ledge for the swim platform to adhere to. cabosil will be used to bond the swim platform to the flotation chamber.




The foam ledge will be totally encapsulated in 1708. I need to let the glass set up tonight and tomorrow I will do a little trimming with my grinder and finish covering the ledge. Tomorrow AM this thing gets broke free from the mold so stay tuned!!

strick
__________________
"I always wanted to piss in the Rhine" (General George Patton upon entering Germany)