this is the starboard side near the helm. I made releif cuts about 2" X 2" squares so it would form better. Now all I have to do is give the 5200 enough time to cure before I remove the screws holding it all in place.
this is the port side further up from the dual station area
this is the very front of the bow area
This is transom area where the live well/storage hatch is