View Single Post
  #5  
Old 08-10-2007, 12:46 PM
schooner schooner is offline
Member
 
Join Date: Mar 2006
Posts: 39
Default Re: 23' Tsunami picture of under floor layout ?

AB1111,
On my Sceptre, all electrical, transducer cables and motor controls / wiring are led to the space below the aft-starboard battery lazerette and from there, run forward under the starboard gunnell to the helm and elec panel. Sercured out-of- sight with cable runs and ties. Very easy to access, dry and very tidy.
__________________
1985 23 Sceptre 225 Johnson Four Stroke
Reply With Quote