Re: 1984 23 floor project
Thanks. That's what we were thinking. We are in the process of removing as much as we can. Have already seen some wet foam in the back area. Will keep some pics posted. The job they did on the transom is perfect. The work was done from a guy that works for Jupiter Boats. Will be covering over the baitwell and installing a good quality hatch to reuse.
|