View Single Post
  #76  
Old 01-18-2008, 01:45 PM
Bobv Bobv is offline
Member
 
Join Date: Mar 2006
Location: Savannah, Georgia
Posts: 56
Default Re: A New Boat to Check Out

A bit more progress. The console is taking a while, but it is ready for paint, except for where it will be glassed to the floor.



Holes are prepared for the motor controls as well as for electronics in the roll up dash. The channel locks will be replaced by an electric actuator to hold up the dash.





The hole below the top is for my bank of storage drawers. They are mounted in a box that can be completely removed if necessary.








Some of my switches will be in a plate mounted under the end of the steering pod.



Battery switch is trial fit into the mounting plate.



Finally, the hull is about ready to paint. The plan is to paint below the spray rail first, place it on the trailer, and move it to an inside location to paint the rest.



Happy New Year!
Reply With Quote