Thread
:
Started 20' upgrade and restore
View Single Post
#
25
01-30-2008, 10:54 PM
billythekid
Senior Member
Join Date: Feb 2007
Location: NJ shore
Posts: 485
Re: Started 20' upgrade and restore
I am waiting for a couple of things before I lay the floor mold up. I made the rim board of the floor mold out of azac board becuase it is flexable and very smooth. I pulled a string down the middle to center all the hatches and accesses. I have 2 freinds coming over to help do the laminating for the floor as It would be to much for one person. In the mean time I made some molds for different things,I made 2 floor flanges for where the rigging comes through the floor in the console and one for where the livewell hoses come up under the well These are to keep things from rolling into the bilge and to keep water off the top of the gas tank. The other pic of the square one is for the back corner of the boat where the engine rigging will come out. I made a groove in the mold at the bottom where the floor will get glassed into it. I installed a 3 inch rigging tube thru the stringer on a 45 degree angle for the livewell drain and intake hose. here are some of the picks. I also test fitted the gas tank and everything it going to work out.
__________________
36' Yellowfin
1972 20' seacraft 140 suzuki
http://www.classicseacraft.com/commu...ad.php?t=18607
billythekid
View Public Profile
Send a private message to billythekid
Find all posts by billythekid