Re: Repower time
priced eds at thier weekend spring sale, prices were average but installation labor was terrible, 12900 on a 250 suzi but 2700 to 3200 installation.Bayracer marine in NC was 13900 installed with 6 year warr for the same 250,Eds said they couldnt touch that. Les
|