It floats!!! Finally got the boat in the water a couple of days ago. Still some work left, but we wanted to get the hard top mounted at exactly the right level and angulation. So we filled it up with 121 gallons of gas (OUCH!), and even placed a few bags of sand to duplicate the weight of the top and chairs. The legs were marked and are now back at the fabricator to be finished.
The F&B Boatworks mastermind in action.
The F&B Boatworks gang (all 725 lbs. of them) at the transom. Check out the scupper height!
In the corner.
The Chairman of the Board with the head of public relations.