Thread: 18SF rebuild
View Single Post
  #1  
Old 05-23-2010, 10:55 PM
adamcannon adamcannon is offline
Member
 
Join Date: Aug 2009
Location: Newport, North Carolina
Posts: 63
Default 18SF rebuild

I have started up on my rebuild again. With hunting season, work, and everything else that keeps us so busy in our day-to-day life, this rebuild has had a slow start. My brother-in-law is helping me with all the glass work and we did get the new stern laminated in place and ready to be glassed in. Here are some pics of the progress so far. Any input is very welcome.

Floor cut out


Console, Box Seat, and Infloor Livewell


Isn't She a Beauty


Boxes cut out


Very, Very rotten stern


Gas tank taken out


Floor cut out and stern wood grinded out


Freshly grinded stern


Gas tank out of tank and sanded to check for leaks


New stern(pinski board) laminated into place


Stern from back with seacraft crown intact


Bracket with platform


T-Top


2004 Johnson 150 to shove it to the Hook at Cape Lookout



Well thats it for now. I still have a long way to go, but the end result will be worth the wait. I am really glad that I found such a sweet website to help me along the way. Again any input will be great.
__________________
1975 Seacraft 18SF w/2004 150hp Johnson 2-stroke on a 26" bracket
Reply With Quote