This is the port side floor. The soft spots wernt the worst. But figured if im going to do it im going to do it right the first time.
The 6 inch access port was put in for gas lines probably. They cut the stringer oped when they installed it and never bothered fixing it. So i had to get into that also.
stringer repair and first fitting of the new floor panels
Floor started to be glasses and screwed down. Screws came out after the epoxy cured the next day..
The screws have since all been taken out and the old skin was re-glassed back onto the top of the wood. Im in the process of sanding out the edges to make it all smooth