Thanks for all the cheering fellas.
I've been doing lots of plumbing over the course of the past several days. Cutting lots of holes in various places on the boat. A few pictures of what has been done.
shot showing the bait tank pump and live well overflow
Raw water pump mounted in engine compartment
There are going to be three Brass drains in the cabin floor
Fresh water pump mounted on the stringer port side in the cabin
Fittings for the bait tank and fresh water nipple
Getting the seat boxes ready
Trial fitting the seat boxes. I need to put a little more foam on the one on the starboard side.
Inspection plates
Backing cleats for the seat boxes. This is PVC board from the local hardware store.
On to the teak swim platform...one of the pieces was missing so I cut a new one
First coat of Cetol
Alaska
strick