Default Re: 23 Rebuild

great looking project shine, stringers and transom tab looks bulletproof. the twin tank idea was a great choice for dealing with c/g issues. i agree with strick as far as crowning the transom cap. (his boats all look great in the rear) as far as a transom livewell, looks cool, i was going to do one on my 20, but if available the floor is a better place for the baitwell. i consulted a profesional tournament fisherman i trust (my brother) and he said below deck with a lower c/g the bait sloshes around less and lives longer. just some consideration before all the work is dry. good luck on the project all looks great so far.