So, I’m just about done with the fish box and live well. The only thing left is some plumbing for the live well and a door for the storage compartment forward of the live well. Here are some pics of the work over the last month:
Fish box lid cores cut and trimmed. I cored the forward hatch first with plywood to support a companion seat pedestal. I over drilled the holes for the screws and then filled them with thickened epoxy.
Then I re-drilled the holes and epoxied SS T-nuts in place.
Then fairing the boxes
Priming with 545
And shot with Awlgrip Oyster White.
I shot the inside of the tubs and lids with gelcoat.
And the (mostly) finished product
That’s all for now…
Dave