View Single Post
  #187  
Old 10-19-2011, 08:46 PM
Blue_Heron Blue_Heron is offline
Senior Member
 
Join Date: Jan 2006
Location: Gator Country
Posts: 1,416
Default

So, I’m just about done with the fish box and live well. The only thing left is some plumbing for the live well and a door for the storage compartment forward of the live well. Here are some pics of the work over the last month:

Fish box lid cores cut and trimmed. I cored the forward hatch first with plywood to support a companion seat pedestal. I over drilled the holes for the screws and then filled them with thickened epoxy.



Then I re-drilled the holes and epoxied SS T-nuts in place.



Then fairing the boxes



Priming with 545





And shot with Awlgrip Oyster White.





I shot the inside of the tubs and lids with gelcoat.





And the (mostly) finished product







That’s all for now…
Dave
__________________
Blue Heron Boat Works
Reinventing the wheel, one spoke at a time.
Reply With Quote