Default Got it inside on a cradle. Dry fitting the penske board

So I can lay out for the stringers that will be raised and extended in the back. I raised floor 2 inches aft changing to 3 1/2 forward. When I start glassing next week I am going to put a lot more glass in the rounded corners before installing the double penske transom. That potter putty made a mess of the transom. The outside gelcoat was all lumpy from the potter putty being cracked from the weak wet transom. I am saving as little as needed of the original transom. The floor will run out to the hull sides. Carmen wanted a lot of crown in the transom covering board. almost 5 inches. Fuel tank base is cut and laying in place so I could measure and lay out for tank order. I have a 74 gal tank going in from S&P in barnegat. One of the top fuel tank builders I know of.