Got done trimming up the flange and put a radius on the corners. Also snapped a picture with the pumps just sitting in the box.
The wires will exit the rear and be sealed by blue sea cable grommets.
I am going to try the method Dave mentioned for fastening the pumps to the floor of the box.
After doing some reading on west system's website I was thinking of using thickened epoxy to seal everything up. Thought this might bond everything together well but would also be paintable so I could fillet the amount that squeezed out and make it look like there was no joint.
|