Here's another question for you. In the below picture, the white un-wetted fiberglass area on the stringer is where the steering cable and throttle cables passed through the deck and then through that area to run outboard and then aft. Since my tank was above deck previously, I had all the room under the deck to bend cables to go aft. Now I am planning a new tank that will end right at the aft end of the last piece of plywood under the deck. I plan on putting the console back in the original place. The problem is that my cable run went through the deck at the un- wetted fiberglass spot which was almost the very back of the console. So , I assume that In order for a new tank to work it will have to be notched on the starboard side the entire length so that I may use the old cable run area through the stringer. I hope I explained that well enough. Is my thinking correct? The tank I want is 60x23x10. Or I could use only a 20" wide tank and push it all the way to port thus leaving me some room for cables. That will offset my center of gravity which I could probably compensate for with battery placement. But fuel load obviously changes. What do you all recommend?