Thread: 23 floor job
View Single Post
  #29  
Old 04-22-2013, 09:59 PM
spiritdude spiritdude is offline
Junior Member
 
Join Date: Jul 2008
Location: Space Coast/Cape Canveral area
Posts: 29
Default

Sullivan21, GodsReel is correct. The rigging tubes did not come up inside the coffin lid. There was actually only one 3" tube down the starboard side, but it didn't have a 90 degree fitting coming up out of the deck. I added those. The floor just had a rectangular opening on the outside floor, so the coffin lid doesn't have any holes. Check out the destruction photos. My glass guys talked me into doing away with the coffin lid and making the floor one piece to add strength. i have a large T-top and e-box, combined with the fact that i usually have a lot of dive tanks on board. The guys i tend to fish with can crack some serious concrete, so my boat gets used to say the least. i added a second 2" rigging tube down the port side to free up the other tube and for future use. i was thinking to see if anyone was interested in the coffin lids, as i don't need them. i should probably put them in the 'for sale' section of this forum.
Attached Images
       

Last edited by spiritdude; 04-22-2013 at 10:02 PM.
Reply With Quote