View Single Post
  #2  
Old 06-16-2013, 11:26 PM
wattaway2 wattaway2 is offline
Senior Member
 
Join Date: Oct 2011
Location: Ft.Lauderdale,Fl.
Posts: 611
Default

Basket in reworking my 23 I was able to run two 11/2 schedule 10 pvc pipes done on each side of the fuel tank into the bilge area I'll thenrun control cables thru the o/b bracket.I feel this will be helpfully in making less bends in the cables and a shorter cable
Reply With Quote