Thread
:
79 Sceptre new floor!!
View Single Post
#
1
06-18-2013, 10:54 PM
Jeff79Sceptre
Senior Member
Join Date: Jun 2013
Posts: 203
79 Sceptre new floor!!
Well, I have been working on this for 2 solid weeks. Lots of sanding, mixing , and
I'm almost ready for water. Floor will be finished by the end of the week. I will still need to paint it but at this point its waterproof. New bilge pump, new filters and housings, motors cleaned and running, minor trailer repair done. All in all this has been a HUGE project. I will say that epoxy resin is the best stuff I have ever used. 1 layer of 1708 on the bottom and 2 on the top. Tripled up on all the seams. It took around 7 gallons to do it all. It's very nice to walk on a solid floor now. Now I need an idea on a livewell (Above deck) with some sort of rear facing seat so the rods can be watched and be comfortable at the same time.
Jeff79Sceptre
View Public Profile
Send a private message to Jeff79Sceptre
Find all posts by Jeff79Sceptre