As federally required, the fill housing, tank, and vessel ground/ battery negative should be bonded with a connection with a combined resistance of less than 1 ohm- ABYC standard h-24.15.1. ABYC h-24 covers all important elements of gas tank installations- they are the standards followed by major manufacturers.
__________________
Bill Potter
18' 1978, Yamaha 130
23' CC 1986, T Suzuki F115s (current full custom project)
|