Thread
:
I must like punishing myself
View Single Post
#
90
04-10-2014, 10:25 PM
billythekid
Senior Member
Join Date: Feb 2007
Location: NJ shore
Posts: 485
alright moving right along , got the supports stuck in for the gas tank, need to slap some glass on them. I got all 8 holes drilled for the drains and got pvc mounted in them and grounded the ones smooth in the bilge to keep it clean looking. I cleaned up the shop so I thought I could put the boat next to laminating table but there is just not enough room. to work side by side.
got the stringers for laminating table, I am using 16ft timberstrands, they are engineered lumber that is straight as an arrow.
I cut the legs for the outer joist 1/4" longer so the center will be 1/4" lower. so this means after I lay it up and flip it over it will have a 1/4" crown in the center for drainage.
shop all cleaned up, once I get the drain plug drilled out in the transom the boat will spend some time outside.
man If I had a week straight to work on it I could really do some damage....
__________________
36' Yellowfin
1972 20' seacraft 140 suzuki
http://www.classicseacraft.com/commu...ad.php?t=18607
billythekid
View Public Profile
Send a private message to billythekid
Find all posts by billythekid