View Single Post
  #126  
Old 05-24-2014, 10:06 PM
billythekid billythekid is offline
Senior Member
 
Join Date: Feb 2007
Location: NJ shore
Posts: 485
Default

I finally got all the hardware to assemble the bilge. you don't realize how much hardware it takes to install all this crap!

I got some of the stuff roughed in before I gelcoated so if I made a mistake it wouldn't be hard to fix. The first thing I do is install pumps, fuel filter, thru hulls. then its time to run the wires and hoses. you can see the thru hull transducer( compliments of trayder) also I used the Yamaha stainless fuel filter housing to keep it from getting crappy.





then came in some more hoses for the livewell and wash down its start to get busy



I also installed a brass sleeve back through the bilge drain. I set it in 5200 and sealed it up on the outside. so with it glassed and sealed with 5200 it should last a long time. plus it gives it a clean look.




gonna get the deck set back in this week
__________________
36' Yellowfin
1972 20' seacraft 140 suzuki

http://www.classicseacraft.com/commu...ad.php?t=18607
Reply With Quote