View Single Post
  #1  
Old 08-20-2014, 02:08 PM
Jeff79Sceptre Jeff79Sceptre is offline
Senior Member
 
Join Date: Jun 2013
Posts: 203
Default

I'm going to cut the floor out of the step down area. I just checked it and it is rotten. Next I'm going to lower the area to gain more storage, ice, space. Then I will use coosa to make some braces into the stringers. I do want make some sort of drain in there. Tapering the floor towards the bow I may be able to get some sort of drain in there so water doesn't puddle towards the rear of the box. Ideas?
Reply With Quote