Just a clarification. The Seafari 25 was built with one less bulkhead than it needed, plus all mine were rotted. The 4 layers of 1708 were laid on the hull under the new bulkheads and tapered so that the bulkhead load would spread. The gap between bulkhead and hull, I filled with thickened epoxy which was also wider than the bulkhead by the time it got to the hull. 3 layers of tapered 1708 to tab the bulkheads to the hull. In retrospect, I probably should have used trapezoidal foam blocks, but so far, no problems.
|