then it was time to figure out how to go about getting the deck in place in a timely fashion with the rigging coming up through it and not in a panic . remember its all about preparation!
got the chain hoist up to the ceiling and did test on where center would be to lift the deck. I threw some straps through the holes and it went up on a little and with the ass end sagging. so I hoisted it up and just got another little rope through the bilge to the ceiling to level it off.
after it was up I put 2 ropes under the deck and back to ceiling for safety.
|