View Single Post
  #9  
Old 01-20-2015, 06:13 PM
bibijawa bibijawa is offline
Recovered
 
Join Date: Jun 2014
Posts: 80
Default

Looks like a lot more work than I thought. Maybe I'll just drill some holes along the bottom and let the excess drain out. I really don't want to remove the deck as it is in good condition and I'm already tight on work space. If it is really fully soaked how many extra pounds can it be? 200 -400?
Reply With Quote