View Single Post
  #32  
Old 03-03-2015, 09:56 PM
FAS FAS is offline
Recovered
 
Join Date: Dec 2015
Posts: 287
Default

Got into the spraying...top decks and inner liner are done. Used all craft off-white Brightside. Dry sanded everything...800 then 1200 grit. Compounded it all out all the way to finesse II the sponge pad. Came out awesome.

Started mounting the flush hardware and rails...using all oval head Phillips for a clean look. Got the floors all done....down to the non skid. I'll do that last.

There is a lot involved and we're moving right along...also have more pictures coming soon.
Attached Images
        
Reply With Quote