View Single Post
  #5  
Old 02-27-2016, 04:39 PM
shine shine is offline
Moderator
 
Join Date: Sep 2010
Location: Vero Beach, FL
Posts: 597
Default

adding chine/bottom tabbing before I run more glass on the bottom. *With all the overlaps, the chine will have a minimum of 4 layer of biax cloth. *Have a few fishing trips lined up next week, and the weather is perfect for glass work, so Im pushing to get as much of the bottom glassed this week as possible. *







Reply With Quote