work continues.
OK So the boat has been moved to Hampton Shipyard for the glasswork to begin on the transom of my 23' cc. We dismantled a little bit more of the rub rail and wiring and control cables ,pumps etc moving them further forward and out of the way. Freddy enlarged the cut out and cut out the loose inner wall of fiberglass that really wasn't attached to the motor well or the hull too well.
|