View Single Post
  #35  
Old 08-17-2016, 08:56 AM
shine shine is offline
Moderator
 
Join Date: Sep 2010
Location: Vero Beach, FL
Posts: 597
Default

more prepping for the wide cloth along the bottom. *Will be running two 30" wide lengths that overlap one another in the space between strakes (under where stringer will be), also overlap up the chine. *Second strip overlaps the keel.

The strakes have been trimmed where they extended all the way through the hull, so glass will go over them.

Pictures below are of the first strip area before glass. *Wetting out wood, filling gaps, making a fillet along bottom of strake.







my helper

Reply With Quote