View Single Post
  #12  
Old 08-27-2016, 05:20 PM
linesider36 linesider36 is offline
Recovered
 
Join Date: Jun 2015
Posts: 100
Default 1 step closer to splash, 42 total days dry.

Transom paint on , needs tape lines buffed out on the sides. New vents installed. white paint for the well and transom caps to be done on Monday. Trim tabs on the table waiting for paint. "And the beat goes on"
Attached Images
   
Reply With Quote