Thread
:
Bottoms Up 23 Build
View Single Post
#
2
08-17-2017, 06:32 PM
Kraken
Recovered
Join Date: Aug 2017
Posts: 113
Plan is to gut all the wood. Replace the floor and transom with Cossa board. Replace tank with two 64 gallon Moeller poly tanks. Hang an Armstrong bracket. Fix the t top and powder coat. Cleanup the original console. Simple right?
Kraken
View Public Profile
Find all posts by Kraken