View Single Post
  #3  
Old 11-15-2017, 08:58 PM
FAS FAS is offline
Recovered
 
Join Date: Dec 2015
Posts: 287
Default

The clamps worked good, a few screws pulling the corners together, and wedges jammed in around the bottom layers secured the new transom to the hull.



Everything jammed in tight. Squeezed out resin everywhere.



All cut to fit, dropped in nicely, cabosiled all the corners and edges. Three layers woven roving outside the plywood and double 1708 tabbed in all the corners.



We are going to go with two 3/4 pieces, marine plywood, laminated together and sandwiched with CSM mat.



Everything is almost cleaned up. A lot of nasty stuff.



Ready to cut it.



Going for the transom. We're gonna make this boat a cut transom at 31", not a bracketed boat.



All the bilges are done, new foam all sealed up, tank platform and new bulkheads. Obviously not going back to an I/O for several reasons. Really do not like the bracket look so it's gonna get cut and framed in with a well like some of the later 23's.



Reply With Quote