Progress
Sorry for the late post but Im having a problem keeping up with JV at Castillo Boats. It is unbelievable how fast this project is going. JV has done such an incredible job from start to finish. Stringers are in and foamed, transom glassed in, and all bulkheads installed. Doing flat floor on boat, here is what we have so far. 24x24 dry storage in front of boat, 24x36 fishbox, 90 gallon fuel tank, 24x36 dry storage behind leaning post, and 30+ inch access to bilge area. Transom is 3 layers of 3/4" Coosa board with 8-9 layers of 1708 from front to front to back of transom. Transom will be trimmed to fit original solid Seacraft transom. New fuel tank will be installed in the next day or two then flat floor installed. Tons of work between now and then will do my best to keep up.
|