I will post some pictures later but I have finished the cap and reinstalled it., and cut out the floor. Floor was only connected to the boat at the splashwell and front locker. All potter putty had let loose on the stringers.my question is what to use for the new floor? I was thinking 3/4 marine ply and epoxy with 1708 1 layer on bottom 2 on top. Thoughts?
|