Thread: Few things done
View Single Post
  #6  
Old 01-13-2019, 02:04 PM
Vezo, Part II Vezo, Part II is offline
Senior Member
 
Join Date: Mar 2012
Posts: 1,026
Default

I had anticipated a PVC pipe, mounted vertically, with slots at the top to accept the anchor shaft. Pretty sure I do not want to mess with my anchors design as much as I use it in the Gulf. Just trying to help others, with 20’s, that there is just not that much room from top of bow, to bow eye. Didn’t realize it before ordering the hatch, and the hole was cut. Foolish and expensive mistake.

Part II
Reply With Quote