Between work, the 95 degree + heat and the rain I’ve managed to do a little to the boat.
Mainly I’ve been putting back the rod holders, the front hand rail and front light and other things back on the boat.
Tomorrow I would like to get the console screwed down.
I have an original console that had the lip used to screw it down. I took a saw and took it off and to hold it down I bought some 1inch aluminum angle secured it to the console and then to the deck, a bit of caulking and I think it will look better.
Sunday is gas tank day. Plan is to get some 85 ethanol gas since it has a way of cleaning the insides of gas tanks and let it work. My tank is in very nice condition and a little cleaning and coal tar and it’s back in. What I do plan on doing is placing some glass strips with 5200 in order to keep it off the bottom of the coffin and let it breathe
|