Thread
:
Bottoms Up 23 Build
View Single Post
#
160
07-30-2019, 12:28 PM
Kraken
Recovered
Join Date: Aug 2017
Posts: 113
Let the rigging begin. Run rail on, fuel done, steering complete. The leaning post even lined up on the aluminum plates under the deck. Still need to finish the plumbing and get a basic electrical system installed to get the motor hung.
Attached Images
Kraken
View Public Profile
Find all posts by Kraken