View Single Post
  #160  
Old 07-30-2019, 12:28 PM
Kraken Kraken is offline
Recovered
 
Join Date: Aug 2017
Posts: 113
Default

Let the rigging begin. Run rail on, fuel done, steering complete. The leaning post even lined up on the aluminum plates under the deck. Still need to finish the plumbing and get a basic electrical system installed to get the motor hung.
Attached Images
 
Reply With Quote