View Single Post
  #11  
Old 06-03-2020, 12:34 PM
hobiepilot hobiepilot is offline
Junior Member
 
Join Date: Jun 2012
Posts: 29
Default

Here are some updated pics from the last couple of days. Things are starting to go back into the boat very quickly now.

Name:  PHOTO-2020-06-03-08-58-37.jpg
Views: 360
Size:  95.2 KB
Transom dry fitted with scupper drains right out the back.

Name:  PHOTO-2020-06-03-08-53-56.jpg
Views: 363
Size:  95.2 KB
Scupper Drain dry fit through the transom box

Name:  PHOTO-2020-06-03-08-43-23.jpg
Views: 359
Size:  95.4 KB
We opened the gutter up so its flows right out of the big scupper drain.

Name:  PHOTO-2020-06-02-12-55-02.jpg
Views: 359
Size:  77.0 KB
Bit scary cutting 2 large holes in the back but we got it in the right place. Pleased to find the transom is bone dry and 2 1/4" thick, transom was redone by the previous owner.

Name:  PHOTO-2020-06-01-14-06-12.jpg
Views: 357
Size:  92.5 KB
Port Side Scupper from above, water fill hole drilled on the cap.

Name:  PHOTO-2020-06-01-13-31-38.jpg
Views: 363
Size:  85.9 KB
Port Side Scupper

Name:  PHOTO-2020-06-01-09-27-33 2.jpg
Views: 359
Size:  93.3 KB
Forward Bulkhead installed on top of the casting deck. Faired the cap into the bulkhead like this instead of straight across. Makes it look a bit more like its one piece.

Name:  PHOTO-2020-06-01-09-27-34 2.jpg
Views: 361
Size:  93.7 KB
Will have a nice sized locker up front for lines, fenders, etc.
Reply With Quote