1988 SeaCraft rebuild
I got some fairing done on the outside of the tub and the swim platform is dry fit in place. It's comprised of 2 layers of 3/4" coosa with a layer of 1700 in between. It will get tabbed in place then a final layer on the top and bottom. I still need to do some finish work and paint on the inside of the tub before it gets glued and glassed in place.
|