View Single Post
  #18  
Old 10-06-2020, 09:44 PM
hobiepilot hobiepilot is offline
Junior Member
 
Join Date: Jun 2012
Posts: 29
Default

Heres an update on the last couple of weeks of work

Name:  FCBD708F-A1D1-4E10-B3EB-2562605D8836.jpg
Views: 237
Size:  97.3 KB

Installed the boxes on either side of the boat. The Port Side will have a fresh water wash-down hose.

Name:  3D22AD3A-1BE4-4974-AE14-DC33E70DEE57.jpg
Views: 235
Size:  93.6 KB

The Starboard side is a box around the fuel fill and vent pipes. the cover will be removable to get in there to take care of any issues that might arise.

Name:  IMG_5939.jpg
Views: 235
Size:  90.4 KB

Finally got the first coat of 545 primer down. Was pretty happy with how it's looking so far.

Name:  IMG_5940.jpg
Views: 237
Size:  90.7 KB

Name:  IMG_5946.jpg
Views: 233
Size:  87.1 KB

Name:  IMG_5944.jpg
Views: 235
Size:  87.4 KB

Name:  8BB98BED-46D1-4DDF-90C8-AC04D5E94389.jpg
Views: 234
Size:  96.5 KB

The Primer shows all the dings and blemishes, vinylester filler all over the place. I finished fairing this filler today and will putting down a coat of High Build Primer next.
Reply With Quote