View Single Post
  #1  
Old 10-09-2020, 08:55 PM
take a potter take a potter is offline
Member
 
Join Date: Apr 2012
Location: lexington, virginia
Posts: 85
Default Rebuild of '75, 23' center console begins

Started the rebuild of my 23' CC this week. Got everything derigged, t-top console and engine is off. Got the transom side boxes and the splash well and in floor bait well off. Washed all the glass dust off of me and the boat and will go at the transom core this weekend.

A few pics...

Name:  20201004_113406 sm.jpg
Views: 311
Size:  41.1 KB

Name:  20201008_105022 sm.jpg
Views: 303
Size:  88.4 KB

There is about a 5/8" curve to the back of the transom. 5/8" at 3 feet from center. Uniform on each side.

Name:  20201009_135702 sm.jpg
Views: 303
Size:  46.9 KB

Was surprised there was only one layer of roving as the inner transom skin. No adhesion at all to the core.

Attachment 22438



Attachment 22439

Attachment 22440

Attachment 22441
Attached Images
     
Reply With Quote