1988 SeaCraft rebuild
It's been a while since I've been able to get much work done however yesterday I faired the fishbox and swim bracket. I will take pics if the coat of epoxy I painted on after ever sets up. It was probably too cold last night. I also finished building the seachest. It will hold 2 Rule 1100's. one for the livewell and one for washdown.
|