After 3 long weeks of watering and applying densifier the big 3 day weekend began. I did have to rent a lull for setting 40’ trusses but the crew as amazing and were very careful to not mess up the concrete in any way. The framework on this building is way more sturdy and heavy than I thought it would be. I was told by the crew that erects commercial building as well that the only step of from this was a red metal building. I did look at them but the cost and wait times for materials was astronomical.